Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 04/15/2024 类别:巷道 当前阶段: Planning and Project Approval
Sandhill Blvd WideningLast Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发
Widen Kings Highway to a 4 lane divided roadwayCharlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发
Reconstruct and widen Parmely Street from U.S. 41号至湾岸道.
Construct multi-use path on Parmely Street from U.S. 41号至湾岸道.
Various Intersection Improvements
Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, 科克伦大道, Peachland大道, and Veterans Boulevard.
Ainger Creek Boat Ramp Replacement
Last Updated: 04/12/2024 Category: 公园和娱乐 当前阶段: 设计开发
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Bridgeless Barrier Islands Accessibility Study
Last Updated: 04/12/2024 类别:其它 当前阶段: Planning and Project Approval
This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, 货物, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, 唐佩德罗岛, and Knight Island/Thornton Key.Last Updated: 04/12/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.Family Services Center - Phase 2
Last Updated: 04/12/2024 Category: 已缴纳的销售税 Category: 县设施 当前阶段: Turnover and Closeout
Completed the 人类服务 integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the 人类服务' staff offices were constructed along with critical shared support facilities, 制造商的空间, and expanded services.